Deck Footing Calculator

Footing count, concrete volume and bag counts per footing — the deck-side companion to our concrete tools.

Please check your inputs — values must be within the allowed ranges.

—
Footings (ref.)
—
Cubic yards
—
80 lb bags
—
Bags per footing

How many footings does my deck need?

The honest answer: it's set by your beam size, joist span and local code — not by a formula. But the common residential starting point is footings spaced 6 to 8 ft apart along each beam, with one at each end. That's what the calculator uses as a reference layout:

For the code-side sizing tables (beam span vs. footing size), see the IRC deck provisions or your local building department. Treat this calculator's count as a planning estimate, not a stamped design.

Concrete volume per footing

Each round footing is a cylinder:

Volume = π × (diameter ÷ 24)² × depth (ft) — diameter in inches, because (d ÷ 2 ÷ 12) is the radius in feet.

A 12-in diameter footing — the default for typical 6x6 deck posts — at common depths, with 10% waste:

DepthVolume80 lb bags per footing
24 in (2 ft)1.57 cu ft3
36 in (3 ft)2.36 cu ft5
42 in (3.5 ft)2.75 cu ft6
48 in (4 ft)3.14 cu ft6

Bell-shaped or flared footing bases add volume — the cylinder math here is the straight-shaft minimum.

How deep should deck footings be?

Below your local frost line (frost depth) — the depth to which ground freezes in winter. Footings that sit above it get heaved and tilted by freeze-thaw cycles, which is what makes decks lean over the years.

Your city or county building department publishes the required frost depth — check it before ordering concrete, because depth is the single biggest driver of your bag count.

Bags vs. ready-mix

Total concreteBetter optionWhy
Under ~1 cu yd (up to ~10 footings @ 12×42 in)Bags (80 lb)No delivery minimum, mix as you go, pour one hole at a time
Over ~1–1.5 cu ydReady-mix truckCheaper per yard, one continuous pour, no mixing labor — but often has a delivery minimum

For exact bag math on any pour size, use the concrete calculator or the bag-focused concrete bags calculator.

Sources & assumptions

Deck footing FAQs

Typically 3–4 for a deck attached to the house (spaced 6–8 ft with one at each end), or about double that freestanding. The exact layout depends on your beam size and local code.
About 4–6 per beam line at 6–8 ft spacing — so 8–12 total freestanding, half that if one side is a ledger on the house. Have your beam size handy when you confirm with the building department.
Commonly 6–8 ft along each beam with one at each end. Allowed spacing depends on beam size, joist span and species — the IRC deck tables and your local department have the final word.
Below the local frost line so freeze-thaw can't heave them — from 12–18 in in mild climates to 42+ in in the north. Your building department publishes the exact depth; deeper also means more concrete per footing.
Estimates only — footing layout, sizing and depth requirements are set by your local building code. This tool does not replace structural design or permit review.