Concrete Bags Calculator
Skip the yards-and-back math: enter your pour and get exact 80lb, 60lb and 40lb bag counts — plus the honest answer on when a truck beats bags.
Please check your inputs — values must be within the allowed ranges.
—
80 lb bags
—
60 lb bags
—
40 lb bags
—
Total weight (80s)
Bags per cubic yard
One cubic yard = 27 cubic feet. Divide by each bag's mixed yield:
| Bag weight | Yield (mixed) | Bags per cubic yard | Weight of one yard |
|---|---|---|---|
| 80 lb | ~0.60 cu ft | ~45 | ~3,600 lb |
| 60 lb | ~0.45 cu ft | ~60 | ~3,600 lb |
| 40 lb | ~0.30 cu ft | ~90 | ~3,600 lb |
A cubic yard weighs about 2 tons no matter how it's bagged — the "total weight" stat above is what your back (or your pickup's payload) is in for.
Bags vs. ready-mix: where's the line?
The economic crossover is around 1 to 1.5 cubic yards — roughly 45 to 65 bags of 80lb:
- Under ~1 yard: bags usually win. No truck minimum, no short-load charge, you mix at your own pace, and leftover bags are returnable at many yards.
- Over ~1–1.5 yards: a ready-mix truck is cheaper per yard, saves hours of mixing, and gives one continuous pour — which matters for slabs, where cold joints between batches are a weak point.
Rule of thumb: if the calculator shows more than about 60 bags, get truck quotes before committing to bags.
Mixing & placement tips
- Water discipline: use only the bag's stated water amount. Extra water makes concrete easier to pour but permanently weaker.
- One-bag batches: a standard wheelbarrow takes one 80lb bag comfortably; a mortar tub or electric mixer speeds up anything past 10 bags.
- Work time: mixed concrete starts setting in about 30–60 minutes in mild weather — don't mix more than you can place in that window.
- Cure, don't rush: keep the surface damp for several days after pouring; fast-dried concrete cracks.
Sources & assumptions
- Bag yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45, 40 lb ≈ 0.30): published yield data for QUIKrete Concrete Mix. Yields vary slightly by brand — check the bag you buy.
- Cubic yard conversion (1 yd³ = 27 ft³): standard units.
- Bags-vs-truck crossover (~1–1.5 cu yd): common DIY guidance — local prices move the exact line.
Concrete bag FAQs
About 45 bags of 80lb (27 cu ft ÷ 0.6), or roughly 60 of the 60lb and 90 of the 40lb bags.
A 12x12 slab at 4 inches is ~1.96 cubic yards — with 10% waste, about 97 bags of 80lb. That's truck territory: get a ready-mix quote first.
Around 1–1.5 cubic yards (45–65 bags of 80lb). Past that the truck is cheaper per yard, saves hours of mixing, and gives one continuous pour.
About 3,600 lb — roughly 2 tons — however you buy it. The calculator's "total weight" stat shows what you'd be hauling in 80lb bags.
Estimates only — always check local building codes before pouring. This tool does not replace structural design.