Post Hole Concrete Calculator
Bag counts per post hole, minus the post volume — most calculators skip that subtraction and sell you extra bags.
Please check your inputs — values must be within the allowed ranges.
Post displacement explained
Most quick calculators compute the whole hole and hand you the bag count — but the post itself takes up space in that hole. Substituting it out is worth real money:
- A "4x4" post is actually 3.5 × 3.5 in after milling
- A "6x6" post is actually 5.5 × 5.5 in
In a 12-in hole 36-in deep, a 4x4 displaces about 0.26 cu ft — roughly a third of an 80lb bag you don't need to buy. Across a 30-post fence line, that's most of a pallet.
The math: hole volume = π × (diameter ÷ 24)² × depth (ft). Post volume = (actual side ÷ 12)² × depth (ft). Concrete = hole − post.
Common post size charts
12-in diameter hole, bags of 80lb, 10% allowance included:
| Post | Hole depth | Net concrete | 80 lb bags |
|---|---|---|---|
| 4x4 | 24 in | 1.40 cu ft | 3 |
| 4x4 | 36 in | 2.10 cu ft | 4 |
| 4x4 | 42 in | 2.45 cu ft | 5 |
| 6x6 | 24 in | 1.15 cu ft | 3 |
| 6x6 | 36 in | 1.73 cu ft | 4 |
| 6x6 | 42 in | 2.01 cu ft | 4 |
Multiply bags by your post count, then round up to full bags — they keep for the next project if kept dry.
How deep should posts be?
Two rules, and the hole depth is whichever is greater:
- The one-third rule: bury at least 1/3 of the post's above-ground height. A 6-ft fence post wants 2+ ft in the ground.
- The frost line: the post bottom must sit below the depth to which your ground freezes, or freeze-thaw will heave posts out of plumb over a few winters. Requirements run from 12–18 in (mild climates) to 42+ in (northern states).
Spacing: fence posts are commonly 6–8 ft apart (tighter for heavy privacy panels or high winds). Deck posts are a different job — see the deck footing calculator.
Sources & assumptions
- Actual post dimensions (4x4 = 3.5 in, 6x6 = 5.5 in): per the American Softwood Lumber Standard (PS 20), ALSC.
- Bag yield (80 lb ≈ 0.6 cu ft, 60 lb ≈ 0.45, 40 lb ≈ 0.3): published yield data for QUIKrete Concrete Mix.
- Post depth rules (one-third rule, frost line): standard fence-building practice — your local frost depth requirement is the authority.